Performance optimization of the
Varian aS500 EPID system
Lucie Berger, Pascal François, Geneviève Gaboriaud, and Jean-Claude Rosenwald
Medical Physics Department, Institut Curie, 26 rue D'Ulm, Paris F-75005 France
lucie.berger@curie.net; pascal.francois@curie.net; genevieve.gaboriaud@curie.net; jeanclaude.rosenwald@curie.netReceived 23 June 2005; accepted 1 November 2005
Today, electronic portal imaging devices (EPIDs) are widely used as a replacement to portal films for patient position verification, but the image quality is not always optimal. The general aim of this study was to optimize the acquisition parameters of an amorphous silicon EPID commercially available for clinical use in radiation therapy with the view to avoid saturation of the system. Special attention was paid to selection of the parameter corresponding to the number of rows acquired between accelerator pulses (NRP) for various beam energies and dose rates. The image acquisition system (IAS2) has been studied, and portal image acquisition was found to be strongly dependent on the accelerator pulse frequency. This frequency is set for each "energy - dose rate" combination of the linear accelerator. For all combinations, the image acquisition parameters were systematically changed to determine their influence on the performances of the Varian aS500 EPID system. New parameters such as the maximum number of rows (MNR) and the number of pulses per frame (NPF) were introduced to explain portal image acquisition theory. Theoretical and experimental values of MNR and NPF were compared, and they were in good agreement. Other results showed that NRP had a major influence on detector saturation and dose per image. A rule of thumb was established to determine the optimum NRP value to be used. This practical application was illustrated by a clinical example in which the saturation of the aSi EPID was avoided by NRP optimization. Moreover, an additional study showed that image quality was relatively insensitive to this parameter.
PACS numbers: 87.53.Oq; 87.59.Jq
Key words: electronic portal imaging device, acquisition parameters, dose, image quality
I. INTRODUCTION
Portal imaging is currently used to verify patient
position during radiation treatment.(1-4) A specific subject of interest with
electronic portal imaging devices (EPIDs) is their ability to
determine patient dose. Portal imaging systems are therefore
developed to provide both geometrical and dosimetric
information.(5-8) Compared to previous
systems, the amorphous silicon-based EPID provides better quality
portal images,(9,10) but in some cases
with a high dose rate or short source-to-detector distance (SDD),
saturation can occur.(11) This
saturation can be avoided by optimizing the software acquisition
parameters.
This study assessed
the performance of the aS500 Varian (Palo Alto, CA) EPID. The
influence on portal image acquisition and dose per image of a major
acquisition parameter, the number of rows acquired between two
consecutive accelerator pulses, called the number of rows/pulses
(NRP), was studied. The influence of this parameter on the EPID
response was investigated as a function of the accelerator pulse
rate repetition. Subsequently, the influence of NRP and of the SDD
on the detector saturation was assessed.
II. MATERIALS AND METHODS
A. The aSi-based EPID
EPID measurements were performed using an aSi portal imager (aS500, Varian Medical Systems) in service mode. This system includes the following components: (1) image detection unit (IDU), featuring the amorphous silicon (aSi) detector and accessory electronics; (2) image acquisition system 2 (IAS 2) containing acquisition electronics for the IDU and interfacing hardware; and (3) a PortalVision workstation. Within the detector, a scintillator converts the incoming X-rays into visible photons. The light is sensed by a photodiode array attached to the amorphous silicon panel. The photodiodes integrate the incoming light into charge captures, and the detector electronics transfer the charges from pixels to read-out electronics. The sensitive area of the panel is 512 × 384 pixels, with a pixel size of 0.784 mm.(12) An image of almost 200 000 pixels is obtained by activating the pixel matrix row after row. The number of rows read between two pulses is controlled by the NRP parameter, which can be chosen by the user.
B. Portal image acquisition theory
The entire matrix is read row by row. Rows are read between beam pulses (Fig. 1(a)). The NRP parameter defines the total number of rows to be read by the IAS2 before charges are transferred from pixels to read-out electronics. The pulse frequency determines the interval between two pulses.
Fig. 1. Portal image acquisition theory. One frame consists of 384 rows read between accelerators pulses. The Start Delay (a) defines the delay time between switching the beam on and starting the image acquisition (beam stabilization time). The Synch.Delay δ (b) is the waiting time after a beam pulse has occurred before the start of row scanning. Two cases, NRP< MNR and NRP > MNR, are displayed on Figs. 1(b). and 1(c), respectively. Black and white bars represent the rows actually read and potentially readable before the next beam pulse, respectively. |
||
From Fig. 1(b) it is clear that the maximum number of rows (MNR), which can be acquired between two pulses, can be calculated using the expression
(1) |
where ν is the accelerator pulse frequency, δ is
the synchronization delay (Synch.Delay), that is, the waiting time
after a beam pulse before the start of row scanning (see Fig. 1(b)),
δ = 1 ms, and Tr, the row
acquisition time, is 0.203 ms.
In
what follows, as a simplification, the term "dose" will be used to
describe the aSi detector response.
The dose per frame (DF) measured
by the aSi detector corresponds to the dose deposited by the number
of pulses delivered during the interval between two readings of the
same row, that is, the number of pulses per frame (NPF).
NPF is calculated by expression
(2):
(2) |
where Ti
is the image acquisition time, its value obtained from the image
file properties; N is the number of averaged frames per
image; its value is chosen by the user and was 4 in this study; ν is
the accelerator pulse frequency; and is the frame
acquisition time.
DF is obtained
by multiplying NPF by the dose per pulse. DF may therefore be
calculated using the following expression:
(3) |
where is the "dose" rate, that is, detector
response/second.
In the
acquisition software, NRP is set by the user. There is no software
restriction, and an NRP larger than the maximum number of rows
between consecutive pulses (MNR) can be set. Two cases are
discussed.
(1) NRP < MNR (see Fig.
1(b))
An entire matrix consists of 384 rows, and all rows
are read between the accelerator pulses. As NRP increases, more and
more rows are acquired for the same number of pulses, resulting in a
greater efficacy and a lower DF. Thus, when the number of rows read
between consecutive pulses increases, DF measured by the detector is
expected to be lower.
(2) NRP > MNR (see Fig.
1(c))
Pulse i: MNR is read during the interval
between pulse i and pulse i + 1. The number of rows
(NRP value) is not completely read during this time interval.
Pulse i + 1: The IAS2 continues to read up
to the number of rows, NRP, which is set by the user. When all rows
have been read, the IAS2 stops reading until the next radiation
pulse, which leaves a spare interval during which no rows are
acquired, resulting in a longer acquisition time to read the entire
image.
From the above equations it
appears that the NPF variation that is proportional to the EPID
response (DF) may be obtained experimentally.
C. Measurements
Four X-ray beam energies ranging from 4 MV to 20 MV were investigated on two Varian LINACS (2300 EX and 2100 C/S). The detector was placed 140 cm from the source, and the full detector surface was irradiated. The SDD was 140 cm for all measurements except when otherwise indicated. Averaging signals of a definite number of frames, called "average frames," create the portal image. This number of frames depends on the acquisition mode selected. Typically, a portal image is obtained from averaging either 4 frames (low-quality mode) or 10 frames (high-quality mode). The frame acquisition is synchronized with accelerator beam pulses. If the frame acquisition starts at the first beam pulse, immediately after the beam is on, there may be one or two initial frames influenced by the beam stabilization. In order to improve the image quality, these initial frames should be discarded. They are called "reset frames." For our measurements, the images consisted of two reset frames, for ensuring beam stability, and four average frames, for acceptable statistics. The EPID response was assessed by averaging 10 × 10 pixels in a squared region of interest centered on the beam axis and multiplying this value by the acquisition time. Energy and frequency dependence were studied. The influence of NRP was investigated with respect to the detector saturation, the dose per image, and the SDD. The aSi detector was calibrated (dark field and flood field corrections) before each modification of the NRP parameter.(13) Our results were confirmed and illustrated by a practical example and a clinical application.
III. RESULTS
A. Energy and frequency dependence
For the four X-ray beam energies studied in this work, different monitor unit (MU) rates may be selected ranging from 100 MU/min to 400 MU/min for the 6- and 20-MV X-ray beams, from 50 MU/min to 250 MU/min for 4 MV, and from 80 MU/min to 400 MU/min for the 10 MV beam. The Varian LINACs use a reference synchronization frequency different for each X-ray beam energy, which corresponds to a maximum theoretical dose rate (see Table 1). The LINAC dose rate is varied by keeping only a fraction (one-sixth) of these pulses (1 of 6, 2 of 6, etc.), but the pulse sequence could then be irregular (e.g., 5 of 6). This pattern serves as a basis to generate regular pulses required for portal imaging providing an acquisition pulse rate repetition according to Table 2. This acquisition pulse frequency is used to calculate MNR (see Eq. (1)) and has a direct influence on NPF variations (i.e., dose variations).
| Table 1. Reference synchronization pulse frequencies for the beams used in this work |
| Table 2. Acquisition pulse frequencies for each experimental condition in this work |
Figure 2 represents the MNR variations as a function of the acquisition pulse frequency. When the frequency increases, MNR becomes smaller. The theoretical data are calculated from Eq. (1), and the experimental data are derived from the EPID response variation (see below Fig. 4), by looking at the NRP difference between two consecutive minima. There is good agreement between theory and experiment, considering that discrepancies could result from δ uncertainties in Eq. (1) and also from uncertainties on measured NPF. This uncertainty is approximately 2%.
Fig. 2. Theoretical and experimental MNR as a function of acquisition pulse frequency. The theoretical data are calculated using Eq. (1) with a synchronization delay δ = 1 ms and a row acquisition time Tr = 0.203 ms. |
||
B. Saturation
Saturation may happen during the A/D conversion. The
14-bit A/D component converts the analog signal from the
pre-amplifier into a signed 13-bit value, that is, 8192 (213). Thus, when pixel counts exceed an
absolute value of 8192, saturation can occur,(11) especially for a high MU rate (400
MU/min) and a short SDD (e.g., 105 cm).
NRP has a major influence on
detector saturation. When the accelerator dose rate increases or
when the SDD decreases, DF increases. Consequently, the absolute
value of the pixel count also increases. To avoid saturation, a
large NRP value must be set (see Fig. 3(a)). Figure 3(b) displays
the average pixel value in the central area as a function of NRP for
the various MU rates of the 4-MV beam. When the dose rate increases,
a larger NRP must be set to avoid saturation.
Fig. 3(a). Averaged central pixel value as a function of NRP for a 4-MV beam. (b) Influence of the MU rate on pixel value for a 4-MV beam for a MU rate of 250 MU/min and a SDD = 140 cm. Detector saturation is observed for NRP ≤ 16. |
||
C. Dose per frame
DF is directly proportional to NPF (see Eq. (3)). NPF undergoes a major relative variation as a function of NRP. Figure 4 shows that, when NRP increases, the relative NPF, that is, the relative dose per frame, decreases to a minimum corresponding to MNR, the maximum number of rows that can be acquired per pulse. As NRP becomes greater than MNR, more pulses are needed to read the entire matrix. NPF reaches a peak and then decreases until a second minimum corresponding to twice MNR, etc. Discontinuities are expected. The experimental relative NPF curve may be described by a theoretical expression (see Eq. (4)), obtained from an intuitive "trial and error" approach, that explains the variations displayed in Fig. 4.
(4) |
where INT , is the integer part of the result of
the division of
, MOD
, is the remainder of the division of
,
n, the total number of rows of the entire matrix, is 384
rows, MNR is calculated using Eq. (1), and INT
is the number of
charge transfers required to read the 384 rows of the matrix. This
first term describes the decreasing part of the curve, and INT
represents the number of accelerator pulses
necessary to read the number of rows chosen by the user (NRP) before
transferring the charges from pixels to read-out electronics. It
explains the discontinuities.
is the
number of pulses necessary to read the remaining rows.
Fig. 4. Theoretical and experimental relative NPF (i.e., relative dose) normalized to its minimum (at NRP = 20) as a function of NRP for a 4-MV beam with a MU rate of 150 MU/min. The theoretical data are calculated using Eq. (4) with an accelerator pulse frequency of 200 Hz (Table 2). |
||
For a 4-MV beam with a MU rate of 50 MU/min (energy and MU rate used for portal images in routine clinical practice), DF may vary by a factor of 50, depending on the NRP value selected.
D. Source-to-detector distance dependence
When the SDD decreases, the dose rate increases and frequency remains unchanged. Saturation is avoided if the user sets a larger NRP. The detector response was measured at two different SDDs: 105 cm and 140 cm. An NRP value larger than 8 was necessary to avoid saturation at 105 cm, whereas NRP > 6 was sufficient at 140 cm. It should also be noted that when saturation is avoided, the detector response variation follows the inverse square law.
E. Practical application
In our institution, we have established a rule of thumb to quickly determine the optimum NRP value to be used. Experimental relative dose curves were used, and the following rules have been set to obtain Eqs. (5) and (6) below:
- If NRP > MNR, NPF should not be in the initial part of the curve where the gradient is very high (Fig. 4),
- Depending on the pulse frequency, two cases were considered:
- for low frequencies (<70 Hz), the NRP value is set just
after the second minimum:
(see Eq. (5)),
- for higher frequencies (>70 Hz), it is set just after the
fourth minimum:
(see Eq. (6)).
- for low frequencies (<70 Hz), the NRP value is set just
after the second minimum:
- NRP ≠ (MNR + 1), NPF should not be on a peak of the curve.
The maximum efficiency (without alteration of image
quality) in terms of patient dose optimization and absence of
saturation is therefore obtained from the following empirical
expressions:
Pulse frequency <70 Hz:
(5) |
Pulse frequency >70 Hz:
(6) |
where NRP corresponds to the number of rows read between two pulses, and MNR is the maximum number of rows that can be acquired per pulse obtained from Eq. (1); pulse frequency is given in Table 2.
F. Clinical example: Dose versus field size
The "dose" measured by the aSi detector
on the beam axis as a function of field size was studied. The
results were normalized to a field size of 10 cm × 10 cm.
For the measurements, a 10-MV beam
with the maximum clinical MU rate (400 MU/min) was used. The
detector was placed as close as possible to the source, which
corresponds to a SDD of 105 cm. No attenuator was placed between the
source and the aSi detector. Field sizes ranged from 5 cm × 5 cm to
27 cm × 27 cm. Images were obtained with 100 MU.
Figure 5 displays the aSi
measurements with and without optimization. Before optimization,
detector saturation occurred for large field sizes. To avoid
detector saturation, an optimized NRP value was determined, and the
aSi detector was able to measure a higher dose without saturation.
Neither an additional attenuator nor a dose rate reduction was
necessary to perform reliable acquisition.(11)
Fig. 5. Variation of the aSi EPID response on the beam axis with the field size. The solid and dashed lines represent aSi response with and without optimization of the NRP parameter, respectively. |
||
IV. DISCUSSION
The use of EPID in radiation therapy could lead to
portal images of poor quality if inconsistent acquisition parameters
are selected. Saturation of the aSi EPID is due to the A/D
conversion. The limits beyond which saturation starts to occur have
been investigated by Van Esch et al.(11) They have shown that for a short SDD,
saturation effects are expected for all acquisitions, except for the
low dose rate settings. Moreover, for the highest dose rates,
saturation becomes an issue even in the standard frame acquisition
mode. Other authors have studied the performance and the limitation
of the aSi EPID.(10,14,15) Vetterli et
al. have even developed a new acquisition mode for PortalVision™ aS500 EPID, which allows one to take
portal images with reduced dose while keeping good image
quality.(16) But the saturation problem
and the optimization of acquisition parameter were never explicitly
treated.
The image acquisition
system (IAS2) was studied, and EPID response was found to be
dependent on the accelerator pulse frequency. This frequency is
dependent on each "energy-dose rate" combination of the linear
accelerator. The influence of the critical parameter NRP on the
performances of the Varian aS500 EPID system has been evaluated. NRP
has a major influence on detector saturation. We have shown that NRP
optimization could allow one to avoid this saturation. A simple rule
has been established to determine the optimum value of NRP. This
rule depends on another parameter, the maximum number of rows that
can be acquired between two accelerator pulses, which is fixed
according to the accelerator pulse frequency.
When such acquisition parameters
are changed, the image quality should be unchanged. This has been
checked by an additional study. The NRP influence on image quality
was assessed by measurements of noise, homogeneity (both horizontal
and vertical), spatial resolution, and contrast performed using a
contrast-detail phantom (Las Vegas phantom, Varian). The image
quality indexes were relatively insensitive to NRP. As expected, no
particular tendency was observed. However, we observed that when NRP
was set exactly to MNR + 1, that is, corresponding to the peaks of
the dose response curve, the quality was poorer with regularly
spaced strips seen on the image.
NRP and all other acquisition
parameters could be changed in service mode. NRP should be optimized
with Eq. (5) or Eq. (6). The change of NRP value will affect portal
image acquisition in clinical mode so an image calibration should be
redone after every change.
This
study is restricted to the aS500 Varian EPID and to the image
acquisition principle on Varian LINACs. The results would probably
be quite different for other accelerators and/or EPIDs, where
similar studies should be performed. In electron beams, where the
bremsstrahlung component may be used for image formation,(17-19) the pulse rate pattern is not
necessarily similar to the one used for photon beams, and the
conclusions may also be quite different.
V. CONCLUSION
The acquisition parameters of the aS500 EPID have been studied, and NRP has been optimized for clinical use in radiation therapy. A predictive model of EPID response as a function of these parameters has been established. The DF, which is proportional to NPF, exhibits strong and irregular variation as a function of NRP. This variation is strongly dependent on MNR, which can be determined by a simple equation. These results illustrate the importance of the saturation effect on the EPID and the need to select a correct value for NRP with respect to each "energy - dose rate" combination. In practice, a rule of thumb has been suggested in order to quickly determine the optimum NRP to avoid detector saturation without degrading image quality.
ACKNOWLEDGMENTS
We would like to thank Jean-Yves Kristner and Christophe Lehobey for their helpful comments on the technology of both the aS500 detector and Varian LINACs, and Varian France for their support.
REFERENCES
- Creutzberg CL, Althof VG, Huizenga H, Visser AG, Levendag PC. Quality assurance using portal imaging: The accuracy of patient positioning in irradiation of breast cancer. Int J Radiat Oncol Biol Phys. 1993;25(3):529-539.
- Fielding AL, Evans PM, Clark CH. The use of electronic portal imaging to verify patient position during intensity-modulated radiotherapy delivered by the dynamic MLC technique. Int J Radiat Oncol Biol Phys. 2002;54(4):1225-1234.
- Warkentin B, Steciw S, Rathee S, Fallone BG. Dosimetric IMRT verification with a flat-panel EPID. Med Phys. 2003;30(12):3143-3155.
- Herman MG, Pisansky TM, Kruse JJ, Prisciandaro JI, Davis BJ, King BF. Technical aspects of daily online positioning of the prostate for three-dimensional conformal radiotherapy using an electronic portal imaging device. Int J Radiat Oncol Biol Phys. 2003;57(4):1131-1140.
- Herman MG, Kruse JJ, Hagness CR. Guide to clinical use of electronic portal imaging. J Appl Clin Med Phys. 2000;1(2):38-57.
- Langmack KA. Portal imaging. Br J Radiol. 2001;74(885):789-804.
- Herman MG, Balter JM, Jaffray DA, et al. Clinical use of electronic portal imaging: Report of AAPM Radiation Therapy Committee Task Group 58. Med Phys. 2001;28(5):712-737.
- Antonuk LE. Electronic portal imaging devices: A review and historical perspective of contemporary technologies and research. Phys Med Biol. 2002;47(6):R31-R65.
- Cremers F, Frenzel T, Kausch C, Albers D, Schonborn T, Schmidt R. Performance of electronic portal imaging devices (EPIDs) used in radiotherapy: Image quality and dose measurements. Med Phys. 2004;31(5):985-996.
- Srinivas Y, Wilson DL. Quantitative image quality evaluation of pixel-binning in a flat-panel detector for x-ray fluoroscopy. Med Phys. 2004;31(1):131-141.
- Van Esch A, Depuydt T, Huyskens DP. The use of an aSi-based EPID for routine absolute dosimetric pre-treatment verification of dynamic IMRT fields. Radiother Oncol. 2004;71(2):223-234.
- Varian MS. PortalVisionT aS500 Rel. 6. Reference manual; 2000.
- Varian MS. Utiliser PortalVision; 2000.
- Antonuk LE, el-Mohri Y, Siewerdsen JH, et al. Empirical investigation of the signal performance of a high-resolution, indirect detection, active matrix flat-panel imager (AMFPI) for fluoroscopic and radiographic operation. Med Phys. 1997;24(1):51-70.
- Munro P, Bouius DC. X-ray quantum limited portal imaging using amorphous silicon flat-panel arrays. Med Phys. 1998;25(5):689-702.
- Vetterli D, Riem H, Aebersold DM, et al. Introduction of a novel dose saving acquisition mode for the PortalVision aS500 EPID to facilitate on-line patient setup verification. Med Phys. 2004;31(4):828-831.
- Grimm DF, Gillin MT, Kline RW, Janjan N. Electron beam port films. Med Dosim. 1989;14(1):31-33.
- Aubin M, Faddegon B, Pouliot J. Clinical implementation of electron beam verification with an a-Si EPID [poster]. In: AAPM 44; 2002 July 14-18, 2002; Montreal; 2002.
- Aubin M, Langen KM, Faddegon B, Pouliot J. Electron beam verification with an a-Si EPID [poster]. In: AAPM 45; 2003 August 10-14, 2003; San Diego; 2003.
© 2005 Am. Coll. Med. Phys.